The Foundation work Starts
The Foundation work Starts


January 22, 1998. The weather has been terrible with huge rainfalls every 5-6 days and little drying time in between. We have got the footings poured tho and, as you can see, the foundation and some brick work has started. The top two images show the back wall of the basement where it will "walk-out" to a patio. The bottom image shows the brick going on along the west side of the house. A good portion of the brick visible in the pictures will probably wind up under ground when things are landscaped. Note how the brick sits on the ledges built right into the "prefab" basement walls. Images from digital camera.
Return